
Oil & Gas supply in United Arab Emirates
ADNOC onshore and offshore work: duplex and 316L spools, API 5L line pipe, sour service plate and flanges, with material released against the project approved vendor list.
24
grades for this sector
5
industrial products
Typical lead time
Same working day ex-stock; cut and profiled within 24 - 48 hours
Material families we lead with in United Arab Emirates.
Wear Resistant Steel
Through-hardened abrasion resistant plate from 400 to 600 HBW
Stainless Steel
Austenitic grades for corrosion resistance across process industries
Duplex & Super Duplex
Twice the strength of austenitic steel with superior chloride resistance
Carbon Steel Plates
Structural, weathering and pressure vessel plate in normalised condition
[ 02 ] Documented grades
Grades we supply for Oil & Gas work in United Arab Emirates.
Industrial products we supply into Oil & Gas.
Valves
Process and project valves supplied to specification
Heat Exchanger Tubes
Shell and tube bundles supplied to the TEMA sheet
Boiler Tubes
Water wall, superheater and reheater tubing
Finned Tubes (Fintubes)
Extended surface tubing for air-cooled and recovery duty
BA Finish Tubes
Bright annealed tubing for clean and instrument service
Other sectors we supply in United Arab Emirates
Quote this against your United Arab Emirates delivery point.
Give us the grade or the duty, the quantity and the delivery point. Our Dubai desk comes back with availability, the certification package and a landed lead time.