[ 01 ] Africa

Morocco

Phosphate, desalination and the Tanger industrial belt.

Morocco's heavy industry runs on phosphate: OCP's mines, slurry pipeline and Jorf Lasfar chemical complex, backed by a fast-growing desalination programme and the Tanger Med manufacturing cluster. The duty is abrasive and acidic, which is exactly where wear plate, 825 and super duplex earn their cost.

Typical lead time

14 - 18 days sea ex-stock

Port of entry

Casablanca, Jorf Lasfar and Tanger Med

Route

Container and break-bulk sea freight from Jebel Ali

Certification & conformity

EN 10204 3.1 / 3.2; IMANOR / import conformity documentation prepared pre-shipment

Shipping to Morocco? Send the enquiry with the plant location.

Give us the grade or the duty, the quantity and the delivery point. Our Dubai desk comes back with availability, the certification package and a landed lead time.